- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of HARBOUR ENGINEERING DEPARTMENT
- >
NTID 47277320
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowGeneral-pmmsy - Expansion Of M in Thiruvananthapuram - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "General-pmmsy - Expansion Of M" in Thiruvananthapuram, India.
HARBOUR ENGINEERING DEPARTMENT
Thiruvananthapuram, Kerala, India
NTID 47277320
- Opening Date : Mon 16th November, 2026
- Closing Date : Fri 13th November, 2026
- ₹ 40874303.00
- NTID 47277320
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
100000.00 -
Document Cost
8270.00 -
Estimated Cost
40874303.00
BOQ Items Total Items : 152 | Total Qty : 65781.834
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Extension of wharf and auction hall at perumathura side - Piling work | ||
| 2 | OD6631/2026-2027:Providing permanent foundation Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. | 19.522 | MT |
| 3 | OD6634/2026-2027:Boring providing and installation bored cast-in-situ M40 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement including hire and running charges of hydraulic piling rig with power unit,including cost of platform,plasticizers etc complete accessories including shifting from one bore location to another complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-750 mm | 704 | metre |
| 4 | OD7079/2026-2027:Plain/Reinforced Cement Concrete, as per Drawing and Technical Specification. For upto plinth level RCC M40 Grade - Using Batching Plant, Transit Mixer and Concrete Pump (BASED ON 12.11.B.9.1) including cost of all form work | 179.087 | cum |
| 5 | OD1531/2026-2027:Supply, Fitting and Placing in position using HCR bar Reinforcement including cost of materials, labour charges, conveyance and placing upto plinth level providing precast cover blocks etc, complete as per Drawing and Technical Specifications and as directed by Engineer in charge . Unit = 1 MT Taking output = 1 MT) | 50.553 | MT |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054