- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of Sports Department
- >
NTID 45189989
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowG V Raja Sports School Mylam in Thiruvananthapuram - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "G V Raja Sports School Mylam " in Thiruvananthapuram, India.
Sports Department
Thiruvananthapuram, Kerala, India
NTID 45189989
- Opening Date : Mon 25th May, 2026
- Closing Date : Fri 22nd May, 2026
- ₹ 13092571.00
- NTID 45189989
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
5900.00 -
Estimated Cost
13092571.00
BOQ Items Total Items : 61 | Total Qty : 22617.57
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Pre Engineered Building Structure | ||
| 2 | 15.2.1 Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 72.000 | cum |
| 3 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 519.900 | cum |
| 4 | 2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 129.975 | cum |
| 5 | OD392975/2025-2026 Densification of soil strata up to a required depth from GL to make holes of 10cm dia by drilling down10cm dia GI pipe with plug of RCC cone at its bottom of the pipe after drilling it to the required depth and to refilling the holes pouring 6mm chips through the pipe to a height about 15cm each lifting 10cm dia pipe by 10cm to 12cm height with proper compaction by MS hammer of 6cm dia and 10cm height connected drill rod to the top of the pipe by lifting and hitting the hammer about 2 times through a height of 75cm after which the chips filled in reach a density of about 1.8 tonnes per m3 including hiring charges of all equipments, cost of labour and conveyance of chips used for filling the holes etc. complete but excluding reinforcement | 1476.000 | metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054