Inquiry NowFor Construction Of Foundation in Bokaro - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "For Construction Of Foundation" in Bokaro, India.
- Opening Date : Wed 25th February, 2026
- Closing Date : Tue 24th February, 2026
- ₹ 677997.00
- NTID 43960598
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
8500.00 -
Document Cost
Refer Documents -
Estimated Cost
677997.00
BOQ Items Total Items : 15 | Total Qty : 684.96
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m inwidth as well as 10 sqm on plan) including disposal of excavatedearth, lead upto 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed Ordinary 2.25M X 2.25 M X 0.5 m X 1 Nos.(Transformer) = 2.53 cum 2.5 M X 1.25 M X 0.5M X 2 Nos (VCB)= 3.125 cum | 5.65 | CUM |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete 2.25 M X 2.25 M X 0.075 m X 1 Nos.(Transformer) = 0.38 cum 2.5 M X 1.10 M X 0.075M X 2 Nos (VCB)=0.41 cum Total=0.79 cum | 0.8 | CUM |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 20 mm nominal size) 2.20 M X 2.20M X1.10M X1Nos (Transformer) =5.32 cum 2.20M X 1.10M X 1.0M X 2 Nos(VCB) = 4.84 cum Total =10.16 cum | 10.16 | CUM |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. (2.25M X1.15M X 2 NOS) X2 nos for 1 no (Transformer) =10.35 Sqm (2.5 MX 1.0 M X 2 nos + 1.25 MX 1.0 M X 2 nos)=7.5 sqm for 2 nos VCB | 17.85 | sqm |
| 5 | Laying of one number PVC insulated and PVC sheathed /XLPE power cable of 11KV grade of following size direct in ground including excavation ,sand cushioning, protective covering and refilling the trench etc as required.Above 70sqmm and upto 120sqmm (Departmental supply) | 50 | mtr. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054