- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Department Of Water Resources
- >
NTID 45068343
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowFlood Protection Work To The L in phulbani - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Flood Protection Work To The L" in phulbani, India.
- Opening Date : Tue 19th May, 2026
- Closing Date : Mon 18th May, 2026
- ₹ 4157689.00
- NTID 45068343
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
41577.00 -
Document Cost
6000.00 -
Estimated Cost
4157689.00
BOQ Items Total Items : 11 | Total Qty : 2077.73
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work excavation in hard soil or gravelly soil within 50m Initial lead and 1.50m initial lift including dressing and leveling the bed and depositing the excavated earth at place away from the work site including cost of all labour, T&P required for the work etc. complete as per direction of the Engineer-in-Charge. | 322.00 | Cum |
| 2 | Earth work in Excavation of foundation in stoney earth and gravels mixed with stone and boulder not exceeding 0.014 cum in volume within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification and direction of the Engineer-in-Charge. | 381.00 | Cum |
| 3 | Filling foundation and plinth with coarse sand watering and ramming including cost, conveyance, royalty ,taxes and labour etc. complete as directed by the Engineer in Charge. | 39.00 | Cum |
| 4 | Rigid and smooth Centering & Shuttering for R.C.C./C.C works including false works and dismantling them after casting and cleaning the surface including cost, conveyance & taxes of all materials with all leads, lifts & delifts including cost o all labour & T&P required for the work etc. complete as per direction of the Engineer in Charge. | 264.40 | Sqm |
| 5 | Providing form work for concrete with F1 finish for guard wall with steel shutter rigidly fixed and removal of forms and making good to the sufaces where necessary complete with all labour, materials and T&P complete as per direction of the Engineer -in-charge | 194.40 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054