Inquiry NowFire Fighting Work For Girls in Orai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Fire Fighting Work For Girls " in Orai, India.
Uttar Pradesh Projects Corporation Limited
Orai, Uttar Pradesh, India
NTID 43952234
- Opening Date : Wed 25th February, 2026
- Closing Date : Wed 25th February, 2026
- ₹ 45258000.00
- NTID 43952234
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
906000.00 -
Document Cost
17700.00 -
Estimated Cost
45258000.00
BOQ Items Total Items : 434 | Total Qty : 21151.28
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Fire Fighting work for Girls, Boys, J.R.S.R and Auditorium for Government Medical College, Orai, District-Jalaun, (U.P.) | ||
| 2 | OVER HEAD WATER TANK (civil work) 10 Nos. | ||
| 3 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C. work in slab (A) Ground Floor | 23.80 | CUM |
| 4 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level upto floor V level Concrete of M25 grade with minimum cement c ontent of 330 kg /cum R.C.C. work in Beam (A) Ground Floor | 18.40 | CUM |
| 5 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C.work in column (A) Ground Floor | 38.00 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054