- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of Nuclear Recycle Board
- >
NTID 43870707
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowFabrication Supply And Instal in Tarapur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Fabrication Supply And Instal" in Tarapur, India.
Nuclear Recycle Board
Tarapur, Maharashtra, India
NTID 43870707
- Opening Date : Mon 9th March, 2026
- Closing Date : Fri 6th March, 2026
- ₹ 9000000.00
- NTID 43870707
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
180000.00 -
Document Cost
Refer Documents -
Estimated Cost
9000000.00
BOQ Items Total Items : 8 | Total Qty : 5363
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Fabrication and supply of MS sections (length - 25 meter) of WM boiler chimney, platforms, ladder, base plate, flanges, etc. as per drawing and technical specification. The work also includes preparation of fabrication drawings, procurement of raw materials and consumables, nuts and bolts, washers, gaskets, marking and cutting of plates/ structural materials, rolling of plates, SMAW/ GMAW/ GTAW, LPT of weld joints, fabrication of Chimney sections as per drawing, inspection & approval of the fabricated items, Surface Cleaning, internal & external heat resistance painting and safe delivery of MS sections of chimney at site. | 22,000 | Kg |
| 2 | Fabrication and supply of SS316L section (length - 7 meter) of WM boiler chimney, helical stakes, flanges, canopy as per drawing and technical specification. The work also includes preparation of fabrication drawings, procurement of SS316L raw materials and consumables, nuts and bolts, washers, gaskets, marking and cutting of plates/ structural materials, rolling of plates, GTAW, LPT of weld joints, fabrication of Chimney Top shell along with the canopy and helical stakes as per drawing, pickling, passivation, inspection & approval of the fabricated items and safe delivery of SS sections of chimney at site. | 1800 | Kg |
| 3 | Dismantling and disposal of old corroded WM boiler chimney. The work also includes removal of the old and corroded Chimney in full including base plates without damaging existing civil structure, squirrel cage ladders, canopy etc, cutting into 2mts length sections and disposal in scrap yard and clearing the foundation for installation of new chimney. | 1 | Lump Sum |
| 4 | Handling, erection and installation of new chimney (length - 32 meter). The work also includes arrangements of heavy material lifting crane, scaffoldings, slings, man power, safety gadgets etc; lifting, erection, vertical alignment and installation of entire new chimney sections along with squirrel cage ladder and canopy on existing civil foundation as per technical specification and site condition. | 2 | No. of chimney |
| 5 | Supply of thermocouples, Universal temperature-Transmitters (PR electronics/ Aplisense/ Equivalent make with CJC), Digital Panel Meter (DPM, 4-20 mA Input, 2 Alarm O/P, Configurable Alarm Set point) etc and installation of thermo couples at two places in the chimney- one at the smoke entry level of the chimney and the other at the bottom end of the top most SS portion - and subsequent installation of temperature Transmitters and DPM in the boiler house with necessary gadgets to facilitate the monitoring of temperatures at the said portions of the chimney (one set as a Spare). | 6 | Set |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054