TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
Sriperumpudur, Tamil Nadu, India
NTID 46114334
- Opening Date : Wed 5th August, 2026
- Closing Date : Tue 4th August, 2026
- ₹ 0.00
- NTID 46114334
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
26620.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 24 | Total Qty : 2237.35
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing juliflora jungle with uprooting including all cost of labour ,lead, lift etc., complete. | 16 | M2 |
| 2 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B 85% | 294 | M3 |
| 3 | Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 18.25 | cu.m |
| 4 | Dismantling clearing away carefully the materials irrespective of thickness of Concrete obtained from R.C.C inside the cable trench and free from debris and without cable laying work including cost of labour, hinderence to the initial lead, lifts, labour, tools and plants, complete. | 21.87 | cum |
| 5 | Supplying and erection of New Earthpit including material, labour, tools and plants, complete. | 2 | nos. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054