- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of MINISTRY OF WATER RESOURCES
- >
NTID 46044596
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowExcavtion In Hard Rock By Cont in Sindhudurg - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Excavtion In Hard Rock By Cont" in Sindhudurg, India.
MINISTRY OF WATER RESOURCES
Sindhudurg, Maharashtra, India
NTID 46044596
- Opening Date : Mon 3rd August, 2026
- Closing Date : Fri 31st July, 2026
- ₹ 2111148.00
- NTID 46044596
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
21200.00 -
Document Cost
2360.00 -
Estimated Cost
2111148.00
BOQ Items Total Items : 7 | Total Qty : 3263.15
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Part I - Total Work Portion | ||
| 2 | Item No. 1 - Excavation in all kinds of Soft Starata including boulders upto 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/ embankment as directed including cost of all materials, machinary, labour, dressing bed and sides to required level and profile etc. complete with lead upto 1 km and all lifts as directed. | 173.8 | Cum |
| 3 | Item No.02 - Excavation in hard rock of all toughness including boulders above 0.6 m dia. (0.113Cum) for canals cut-off trench of embankment filter / catch water drains and other appurtenant structures by control blasting methods including control of vibrations by use of delay detonators and control of fly rocks by muffling arrangements and adopting only jack hammers for drilling holes and minimising damage to side slopes of canal in water prism area by adopting any one or combination of line drilling / pre-splitting / smooth blasting techniques including cost of all materials, machinery, labour, placing excavated rock neatly approved dump area as directed etc., complete with lead upto 1 km and all lifts as directed | 2263.35 | Cum |
| 4 | Item No.03 - Excavation in hard rock of all toughness by breaker including boulders above 0.6 m dia. (0.113Cum) minimising damage to side slopes of excavation and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, levelling bed etc., complete with lead upto 1 km and all lifts as directed. | 825 | Cum |
| 5 | PART II Insurance/Royalty |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054