Inquiry NowExcavation Desilting Constr in ANTA - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Excavation Desilting Constr" in ANTA, India.
- Opening Date : Tue 26th May, 2026
- Closing Date : Mon 25th May, 2026
- ₹ 2897000.00
- NTID 45192924
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
57940.00 -
Document Cost
1000.00 -
Estimated Cost
2897000.00
BOQ Items Total Items : 12 | Total Qty : 29288.28
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. (b)Thick | 14400.00 | Sqm |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect in. (b) Hard/dense soil. | 11760.68 | Cum |
| 3 | Centring and shuttering for slabs, beams,lintels,columns,trough with or without caps and base including proping and remove. | 99.24 | sqm |
| 4 | Side shuttering including propping etc. complete (to achieve finish F 2 for :(c)Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 267.80 | sqm |
| 5 | Supplying of MS reinforcement including labour charges for bending, binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars(IS :1786-1985) | 2256.66 | kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054