- Home
- >
- Tender
- >
- Haryana Tender
- >
- Department of Haryana Police Housing Corporation Limited
- >
NTID 45189939
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowEstimate For White Wash Of Var in MOHINDERGARH - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Estimate For White Wash Of Var" in MOHINDERGARH, India.
Haryana Police Housing Corporation Limited
MOHINDERGARH, Haryana, India
NTID 45189939
- Opening Date : Fri 22nd May, 2026
- Closing Date : Thu 21st May, 2026
- ₹ 1035365.00
- NTID 45189939
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
10000.00 -
Document Cost
1180.00 -
Estimated Cost
1035365.00
BOQ Items Total Items : 6 | Total Qty : 25675.08
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | HSR ITEMS- [11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete [Through Rate] | 711.05 | Sqm |
| 2 | [28.16]Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken up to 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately). For the purpose of measurement the entire treated surface will be measured. [Through Rate] | 232.05 | Sqm |
| 3 | [30.25.1]Distempering with 1st quality acrylic distemper (Ready mix) having VOC content less than 50 grams/ litre of approved brand and manufacture to give an even shade : 1. Old work (one or more coats) [Through Rate] | 9381.79 | Sqm |
| 4 | [30.28.1]Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : 1. One or more coats on old work [Through Rate] | 1438.01 | Sqm |
| 5 | [30.37.2]Finishing walls with Acrylic Smooth exterior paint of required shade : 2. Old work (One or more coat applied @ 0.90 litre/10 sqm). [Through Rate] | 13896.47 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054