- Home
- >
- Tender
- >
- Gujarat Tender
- >
- Department of ROAD AND BUILDING DEPARTMENT
- >
NTID 46062207
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowEmpanelment Of Consultant For in Morbi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Empanelment Of Consultant For " in Morbi, India.
- Opening Date : Refer Documents
- Closing Date : Thu 6th August, 2026
- ₹ 0.00
- NTID 46062207
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
1500.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 28 | Total Qty : 23
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | BUILDING SECTION | 0.000 | 0 |
| 2 | (Building Work) Survey and Preparingcampus plan drawing (Using totalstation) details of all existingbuilding structure plan, boundary,location of utility like electricity,drainage, water supply etc. of treesetc. and submitting all details insoft copy in PDF and hard copy inAutoCAD drawing above 2010version. | 1.000 | Per SQFOOT |
| 3 | (Building Work) Preparing Estimatefor construction of newbuilding(with all necessary ancillary work)including scrutinizing the estimateas per instruction of sanctionedauthority with all requirednecessary drawing and otherdetails the required RA andQuotation etc. (Submitting alldetails in soft copy in PDF and hardcopy) including getting TechnicalSanction | 1.000 | Percentage ofEstimatecost |
| 4 | (Building Work) Preparing Estimatefor repairing of existing building asper instruction of Engineer incharge (with all necessary ancillarywork) including scrutinizing theestimate as per instruction ofsanctioning authorities with allrequired necessary drawings otherdetails the required RA andQuotation etc. (Submitting alldetails in soft copy in PDF and hardcopy) including getting TechnicalSanction | 1.000 | Percentage ofEstimatecost |
| 5 | (Building Work) Preparing Estimatefor Dismantling building as perinstruction of Engineer in charge(with all necessary ancillary work)including scrutinizing the estimateas per instruction of sanctioningauthorities with all requirednecessary drawings other detailsthe required RA and Quotation etc.(Submitting all details in soft copyin PDF and hard copy) includinggetting Technical Sanction | 1.000 | Percentage ofEstimatecost |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054