- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY
- >
NTID 42769715
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowEmergent Repair Work Of Gaznav in Kolkata - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Emergent Repair Work Of Gaznav" in Kolkata, India.
KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY
Kolkata, West Bengal, India
NTID 42769715
- Opening Date : Mon 8th December, 2025
- Closing Date : Fri 5th December, 2025
- ₹ 1262259.00
- NTID 42769715
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
25245.00 -
Document Cost
Refer Documents -
Estimated Cost
1262259.00
BOQ Items Total Items : 28 | Total Qty : 2312833.608
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1,500 mm. | 5.600 | %Cum |
| 2 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 14.000 | Sqm |
| 3 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. Where staging is not required. | 19.050 | Sqm |
| 4 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mmnominal size)excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety | 5.380 | Cum |
| 5 | Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth | 6.000 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054