- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of HIMACHAL PRADESH STATE ELECTRICITY BOARD
- >
NTID 46095814
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowE-tender For Relay Healthiness in Sirmaur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "E-tender For Relay Healthiness" in Sirmaur, India.
HIMACHAL PRADESH STATE ELECTRICITY BOARD
Sirmaur, Himachal Pradesh, India
NTID 46095814
- Opening Date : Fri 7th August, 2026
- Closing Date : Fri 7th August, 2026
- ₹ 0.00
- NTID 46095814
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1752.00 -
Document Cost
590.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 5 | Total Qty : 4
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | O/M of 220/132kV Sub-station at Girinagar | ||
| 2 | Relay Healthiness Check, Rectification, Reconfiguration, Testing & Commissioning of ABB REC 670 BCU installed in khodri circuit -1 panel ,as the existing BCU Relay is blank display.The scope of includes diagnosis, rectification of faulty relay , restoration of complete BCU functionality ,SAS/SCADA communication validation, relay configuration verification, gateway communication checking, data validation and submission of backup files complete in all respects at 220 kV Control Room Giri Nagar. | 1 | Job |
| 3 | Troubleshooting, Rectification, Reconfiguration Testing & Commissioning of 220 kV Bus Bar Protection Scheme including nuisance tripping investigation of khodri circuit -2 due to incorrect bus bar protection relay configuration, The scope includes verification & correction of protection logic , relay setting and configuration in panel, wiring verification, testing, SCADA validation and restoration of completeBus Bar protection scheme in all respects at 220 kV Control room Giri Nagar. | 1 | Job |
| 4 | Rectification of GPS Clock time synchronization, correction of GPS Clock settings, synchronization of all numerical protection relays with GPS Clock, verification of relay event/fault record time and confirmation of accurate time synchronization with SAS/SCADA. | 1 | Job |
| 5 | Laying, dressing, clamping, double end termination, testing and commissioning of HPSEBL supplied 19 Core Copper Control Cable (220 meter) from OLTC Control Panel to OLTC of 132/33 KV 25/31.5 MVA Power Transformer No. 1 & 2, including supply & Fixing of suitable brass cable glands, copper lugs, ferrules, identification sleeves, cable ties, clamps, nuts, bolts, washers, earthing accessories, all consumables, labour, continuity test, insulation resistance (Megger) test and successful functional testing of OLTC in Remote/Local mode, complete in all respects. (Control Cable shall be supplied by HPSEBL). | 1 | Job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054