- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of Archaeological Survey of India
- >
NTID 42903777
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowDevelopment Work Of Baleshwar in Champawat - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Development Work Of Baleshwar " in Champawat, India.
Archaeological Survey of India
Champawat, Uttarakhand, India
NTID 42903777
- Opening Date : Tue 9th December, 2025
- Closing Date : Mon 8th December, 2025
- ₹ 5943452.00
- NTID 42903777
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
178300.00 -
Document Cost
Refer Documents -
Estimated Cost
5943452.00
BOQ Items Total Items : 55 | Total Qty : 2133.15
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Development Work of Baleshwar Temple Complex Champawat., under the Jurisdiction of Dehradun Circle -Uttarakhand | ||
| 2 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S.Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. | 194.46 | Sqm |
| 3 | Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. | 140.70 | Sqm |
| 4 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 7.28 | Cum |
| 5 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead : of sectional area 40 square centimetres and above | 11.41 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054