- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of Sriniketan Santiniketan Development Authority
- >
NTID 43974430
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowDevelopment Of Pcc Road Along in Bolpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Development Of Pcc Road Along " in Bolpur, India.
Sriniketan Santiniketan Development Authority
Bolpur, West Bengal, India
NTID 43974430
- Opening Date : Fri 27th February, 2026
- Closing Date : Tue 24th February, 2026
- ₹ 3268898.00
- NTID 43974430
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
65378.00 -
Document Cost
Refer Documents -
Estimated Cost
3268898.00
BOQ Items Total Items : 11 | Total Qty : 3345.31
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | DRAIN: Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 506.53 | Cum |
| 2 | Sand filling in foundation or plinth by silver sand in layers not exceeding 15cm as directed and consolidating same by thorough saturation with water and ramming complete including the cost of supply of sand. (Payment to be made on measurement of finished quantity). | 53.32 | Cum |
| 3 | Supplying & Polythene Sheet over damp proof course or below flooring or roof terracing or in floor or in foundation trenches. | 533.20 | Sqm |
| 4 | Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. RCC M20. Using concrete mixer. | 214.27 | Cum |
| 5 | Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications. | 0.24 | mt |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054