- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Harish Chandra Research Institute
- >
NTID 43082594
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowDevelopment Of Area Near Secur in Allahabad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Development Of Area Near Secur" in Allahabad, India.
Harish Chandra Research Institute
Allahabad, Uttar Pradesh, India
NTID 43082594
- Opening Date : Wed 24th December, 2025
- Closing Date : Tue 23rd December, 2025
- ₹ 1750000.00
- NTID 43082594
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
35000.00 -
Document Cost
Refer Documents -
Estimated Cost
1750000.00
BOQ Items Total Items : 29 | Total Qty : 2152.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil | 300 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3 | Cum |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 3 | Cum |
| 4 | Centering and shuttering including structting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete | 35 | Sqm |
| 5 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo mecahnically treated bars | 300 | Kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054