- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of Public Works Department
- >
NTID 47238871
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowDeposit-kseb-restoration Works in Thodupuzha - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Deposit-kseb-restoration Works" in Thodupuzha, India.
Public Works Department
Thodupuzha, Kerala, India
NTID 47238871
- Opening Date : Sat 7th November, 2026
- Closing Date : Thu 5th November, 2026
- ₹ 81114.00
- NTID 47238871
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 5 | Total Qty : 86.25
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | DETAILED ESTIMATE | ||
| 2 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 12.15 | cum |
| 3 | 4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method | 4.05 | cum |
| 4 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 4.05 | cum |
| 5 | OD120803/2026-2027:Filling up potholes with bituminous ready mix compound ( 25 Kg bag) and compacting by ramming to get a compact surface including cost of material, laying charges, transportation to site etc. ( Rate is arrived for a bag of 25 kg) | 66 | each |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054