- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of State Industries Promotion Corporation Of Tamilnadu Limited
- >
NTID 45858757
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCreation Of Infrastructure Fac in Manaparai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Creation Of Infrastructure Fac" in Manaparai, India.
State Industries Promotion Corporation Of Tamilnadu Limited
Manaparai, Tamil Nadu, India
NTID 45858757
- Opening Date : Tue 11th August, 2026
- Closing Date : Mon 10th August, 2026
- ₹ 436000000.00
- NTID 45858757
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2190000.00 -
Document Cost
Refer Documents -
Estimated Cost
436000000.00
BOQ Items Total Items : 100 | Total Qty : 378193
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Road Work (Part-A) | ||
| 2 | Removing the top soil including Earth Work Excavation in all classes of soils, removal of weeds and vegetation, roots etc., and depositing in the places shown by the SIPCOT Officer etc., complete and as per the standard specification and as per the direction of SIPCOT Officials. | 35888.00 | Cum |
| 3 | Supplying and laying of 300 mm dia. RCC non pressure spun pipes with socket and spigot ends - NP 2 class as per IS 458/2003 manufactured with sulphate resistance cement with 12mm Hi - alumina lining with rubber rings including labour charges for laying at proper levels and locations, transportation cost, jointing materials etc complete complying with standard specification and as directed by SIPCOT Officers. | 1170.00 | Rm |
| 4 | Forming Embankment by conveying earth with in a lead of 10 KM from borrowed area outside the complete with a lead of 10km having CBR value not less then 7% which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 200 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 97% proctor density for the soil below the top of 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete as per MORTH standard specification and as directed by SIPCOT Officers. | 13156.00 | Cum |
| 5 | Forming Sub Grade by conveying earth with in a lead of 10 KM to the required compacted thickness as per Table 300 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers. | 35143.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054