ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum S i t c Of 500mt in Udhamsign Nagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum S i t c Of 500mt" in Udhamsign Nagar, India.
MD Uttarakhand Agriculture Produce Marketing Board Rudrapur
Udhamsign Nagar, Uttarakhand, India
NTID 43752659
- Opening Date : Tue 24th February, 2026
- Closing Date : Mon 23rd February, 2026
- ₹ 0.00
- NTID 43752659
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1700000.00 -
Document Cost
4720.00 -
Estimated Cost
Refer Documents
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | date extension | Date |
BOQ Items Total Items : 147 | Total Qty : 266271.04
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation in trenches for foundation and for pipes cables etc. in ordinary soil including fitup to 1.5m and dressing of sides and ramming bottoms and disposal of surplus excavated earth as directed by the engineer with in a lead of 50m (2.6.1 D.S.R. 2023) | 423.63 | cum |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. (2.26.1 D.S.R. 2023) | 240.49 | cum |
| 3 | Filling available excavated earth (excluding rock) in trenches ,plinth,sides of foundation etc . in layers not exceeding 20cm in depth ,consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m (2.25 D.S.R. 2023) | 296.54 | cum |
| 4 | Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and irection of Engineer -in - charge.(2.38 D.S.R. 2023) | 1079.98 | cum |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.(2.27 D.S.R. 2023) | 270.00 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054