- Home
- >
- Tender
- >
- Punjab Tender
- >
- Department of Military Engineer Services
- >
NTID 42795665
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Repair Maintenan in Dappar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Repair Maintenan" in Dappar, India.
- Opening Date : Wed 24th December, 2025
- Closing Date : Mon 22nd December, 2025
- ₹ 5500000.00
- NTID 42795665
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
110000.00 -
Document Cost
1000.00 -
Estimated Cost
5500000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum |
BOQ Items Total Items : 147 | Total Qty : 16275.93
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Material and labour for dehydration/filtration of transformer oil with mobile transformer filtration plant at site with all required accessories connected to transformer and carrying out filtration of old transformer oil for the desired dielectric strength of 60 KV at 2.5mm gap complete all as specified and as directed. | 8000.00 | Ltr |
| 2 | Supply only transformer oil low viscosity EHV grade having 60 KV di-electric strength conforming to IS-335 in original company sealed drum for replacement or topping up to oil level mark at the conservator complete all as specified and as directed. | 400.00 | Ltr |
| 3 | Disconnecting HT/LT and earth termination connections from transformer, taking down the transformers from plinth/platform and loading into the vehicle; transporting the same to workshop for carrying out necessary repairs and back reconnecting HT/LT connections at site and charging the transformer on load, commissioning and testing including meggar test at site complete all as specified and as directed. | 4.00 | Each Job |
| 4 | Draining out transformer oil, dismantling top cover alongwith conservator tank, taking out core and coil assemblies after disconnecting connections, rewinding of burnt out HV/LV coil with same size and type of super enamelled copper conductor and number of turns to get the same rating and insulating material such as paper insulator sleeves, heating etc. Putting back the core and coil assemblies into the tank after removing sludge and replacement of HT & LT bushing complete with brass terminal, refixing top cover and conservator including replacement of gasket, nut, bolts & washers (filling new transformer oil having 60 KV dielectric strength and carring out tests as per IS 2026 in presence of Engineer - in - charge for transformer 50 to 100KVA. NOTE : (I) New transformer oil and its filling shall be measured and paid separately under relevant items of schedule.(ii) Cost of rewinding material, insulation material and spares of transformer shall be measured and paid separately under relevant item of Sch .(iii)Replacement of spares will be on required basis complete all as specified and as directed.. | 2.00 | Each Job |
| 5 | All as per item No. 4.00 here-in before but for 100 to 300 KVA | 1.00 | Each Job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054