- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Agra Development Authority
- >
NTID 42937594
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Wor in Agra - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Wor" in Agra, India.
Agra Development Authority
Agra, Uttar Pradesh, India
NTID 42937594
- Opening Date : Sat 20th December, 2025
- Closing Date : Fri 19th December, 2025
- ₹ 0.00
- NTID 42937594
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2552000.00 -
Document Cost
5900.00 -
Estimated Cost
Refer Documents
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | DATE UPDATE | Date |
BOQ Items Total Items : 11 | Total Qty : 3001214
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Sewage Treatment Plant STP ( 1000 KLD) for Phase-01 ( Machinery) Supplying, installing, testing & commissioning of Sewage Treatment Plant of 1000 m3/day based on MBBR technology Nature of Sewage - Domestic Sewage waste water shall be discharged into the STP. Design to take consideration of same. The STP design based on the following parameters: Daily average flow: 1000 M3/Day Working Hour: 24 Hour PH : 7.5 - 8.5 BOD5 : 250 - 300 mg/l S. Solids : 200 - 450 Mg/l COD : 350 - 500 mg/l Oil & Grease : 40-150 mg/L Effluent discharge standard after treatment :- PH : 6.5 - 7.5 BOD5 : Less than 30 mg/l S. Solids : Less than 10 mg/l COD : Less than 80 mg/l Oil & Grease : Less than 5 mg/l Electro-Mechanical Equipment Bar Screen : Supplying, installing, testing & commissioning manual Bar screen including 2 nos course & fine screen of particular size having provision for lifting arrangement etc. complete as required. Size : 1000mm X 600mm MOC : MS Purpose: For separation of large solids Oil Skimmer Supply, Installation, Testing & Commissioning of Oil Skimmer. Purpose : Removing oil from water Submersible Pumps Supply, installation, testing & commissioning of non clogging type Submersible Pumps having CI casing & CI impeller complete for working. Sewage Transfer Pump Flow Rate : 50 m3/hr Head : 12mtr Solid handling : 35 mm Purpose: For sewage transfer from equalisation tank to Anoxic Tank Agitator for Anoxic Tank Supply, Installation, Testing & Commissioning of agitator for anoxic tank. MOC: MS MBBR Media Supply, installation, testing and commissioning of MBBR media to be installed in MBBR reactor along with suitable Equipment. Purpose: For biological treatment Path for Air providing Non clog, Self Cleaning type air dispersion system capable of handling 3-5 cfm of air with oxygen transfer efficiency of 3-4% per / meter water depth. Air dispersion grid shall be assembled in modular form so that they can be replaced / repaired easily from plat form at the top. Coarse Bubble Diffusers (In Equalization Tank & Sludge Holding Tank) Fine Bubble Diffusers (In MBBR Tanks) Purpose :- For Providing the path of Air Sludge Recirculation Pump Supply, installation, testing & commissioning of non clogging monoblock type Sludge Recirculation/Transfer pump having CI casing & impeller with all required equipment. Flow Rate : 30 m3/hr Head : 12mtr Solid handling : 7 MM Purpose: For transfer sludge to Sludge holding tank and recirculation Air Blower Supply Installation Testing & Commissing of Air blower Twin type rotary air blowers (1W + 1S) capable of delivering 1200 M3/hr of free air at 0.5 kg/cm2 driven through V belt or directly coupled through flexible coupling to a TEFC motor of suitable HP Suitable for 415 10% volts, 3 phase, 50 cycles A/C supply. Including foundation and foundation bolts work. Purpose: For air supply to equalisation tank/sludge holding tank/MBBR reactor Tube Deck Media Supply, installation, testing and commissioning of suitable PVC tube deck settling media to be installed in Tube Setller tank alongwith suitable sludge removal arrangement either by pumps or air lifting pumps. Purpose: For Better Settlement of Sludge Filter Feed Pump Supplying, installing, testing & commissioning of Horizontal centrifugal non clog Filter feed pumps with CI casing and CI Impeller along with motor, for the pump. The pump shall be suitable for 415 10% volts 3 phase AC supply.(1 Working + 1 Standby) Capacity : 50 m3/hr Head: 30 Mtrs Purpose : For Feed Water into Filter MGF/ACF Pressure Sand Filter Providing, fixing, testing & commissioning of vertical filter with adequate dirt holding capacity complete with intitial charge filter media, appropriate thickness of shell 8 mm & dish 10 mm of Filter with frontal pipe Upvc/Ms all required. Type : Down Flow Flow rate: 50 m3/hr Dia : 2100 mm Filter Media: Sand & Gravel Purpose: For removal of suspended solids Activated Carbon Filter Type : Down Flow Flow rate: 50 m3/hr Dia : 2100 mm Filter Media: Activated Carbon MOC: Mild Steel Purpose: For removal of color & odor Sludge Feed Pump Supply, installation, testing and commissioning of Sludge Feed Pumps Screw type Complete with all fittings & accessories. Including foundation and foundation bolts.( 2Nos.- 1W+1S) Capacity : 5 m3/hr Head : 40 mtr MOC :CI Purpose : For Feed Sludge to Basket Centrifuge Basket type Centrifuge Supply, installation, testing and commissioning of Basket type Centrifuge of particular size with all fittings & accessories. Size: 36'' Purpose : For Sludge Dewatering Dosing Pump Supply, installation, testing & commissioning of Poly dosing system comprising of 500 ltrs HDPE/FRP tank with 0-12 lph electronic metering type pump. Purpose : For Thickening of Sludge Chalorine Dosing System Supply, installation, testing & commissioning of Chlorine dosing system comprising of 500 ltrs HDPE/FRP tank with 0-12 lph Hypochlorite Dosing electronic metering type pump. Purpose : For Disinfection of water Ultra filtration Supply, installation testing and commissioning of packaged type Ultra filteration unit with all components and accessories complete to make the system functional and shall be installed after water treatment system in STP With UF Feed pump, backwashing arrangement with all respect for working. Capacity: 50 m3/hr Purpose:- For Membrane Filteration Piping Providing and fixing all piping (as described below) and isolation control valves for making the system complete. upvc : Submerged air piping MS Epoxy : Air piping & pumped effluent riser (non-submerged) UPVC : Interconnecting pipe line after delivery header of pump/ filter UPVC: Pumped effluent (submerged) & tank overflow pipe line Purpose :- For Flow Control & Transfer path of Flow INSTRUMENTS WORKS FOR SEWAGE TREATMENT PLANT Flow meter Suppy, installation, testing & commissioning of electro-mangnetic type flow meter at inlet of reactor tanks. Location: Inlet & Outlet Purpose : For Measure flow quantity with time Level Controller Suppy, installation, testing & commissioning of Level controller for pump on/off when required. Purpose : For control Amount of Influent in tank Pressure Gauge Suppy, installation, testing & commissioning of Level controller for pump on/off when required. Make: H Guru/Inflow/Waree/Eqvt. Purpose : For Measure & Indicate the pressure into vessel ELECTRICAL Panel with Cable FOR SEWAGE TREATMENT PLANT This includes Design, supply, installation, testing and commissioning of STP Main Electrical Panel (MCC) within the plant room. MCC -1 (Sewage Treatment Plant) Make : CPRI Approved Supply, Installation, testing and Commissioning of 1000 KLD STP on MBBR Technology as described above complete in all respect. | 1.00 | Set |
| 2 | STP Civil Works: Supplying, installation, testing and commissioning of STP/ETP of appropriate technology including Civil Works (except plant room), Tertiary Treatment etc. for the Building/ campus Plant size upto 50KLD (PAR 2023 No. 6.20.1) | 50.00 | Per KLD |
| 3 | Add extra for every KLD for plant size above 50KLD and upto 100 KLD (PAR 2023 No. 6.20.2) | 50.00 | Per KLD |
| 4 | Add extra for every KLD for plant size above 100 KLD (PAR 2023 No. 6.20.3) | 900.00 | Per KLD |
| 5 | Underground Tank - 2000 KL ( 1000 KL ( Raw)+ 1000 KLD ( Domestic)): Underground Sump (Tank) 2000 KL (PAR 2023 No. 4.5) | 2000000.00 | Litre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054