- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of URBAN DEVELOPMENT DEPARTMENT
- >
NTID 45823346
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of in Gumla - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in Gumla, India.
- Opening Date : Wed 5th August, 2026
- Closing Date : Tue 4th August, 2026
- ₹ 135184452.00
- NTID 45823346
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1352000.00 -
Document Cost
25000.00 -
Estimated Cost
135184452.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Corrigendum -1 | Date |
BOQ Items Total Items : 624 | Total Qty : 190108.41
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 4465.00 | SQM |
| 2 | Felling trees of the girth (measured at a height of 1 m above groundlevel), including cutting of trunks and branches, removing the roots andstacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth | 2.00 | NOS |
| 3 | Felling trees of the girth (measured at a height of 1 m above groundlevel), including cutting of trunks and branches, removing the roots andstacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth | 2.00 | NOS |
| 4 | Earth Work in excavation in Foundation Trenches in Ordinary soil (vide classification of soil item -B) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I | 1883.07 | CUM |
| 5 | Extra for earth work in hard soil as per specification & direction of engineer in charge (Vide classification of soil item B) | 1171.72 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054