- Home
- >
- Tender
- >
- Goa Tender
- >
- Department of Department Of Water Resources
- >
NTID 42952007
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of in Bicholim - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in Bicholim, India.
- Opening Date : Tue 23rd December, 2025
- Closing Date : Mon 22nd December, 2025
- ₹ 4654510.00
- NTID 42952007
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
93090.00 -
Document Cost
4000.00 -
Estimated Cost
4654510.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | ADDENDUM | Other |
| 2 | ADDENDUM | Other |
BOQ Items Total Items : 2 | Total Qty : 2
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Scope of Work for Preparation of Disaster Management Plan Preparation of Disaster Management Plan Preparation of Disaster Management Plan, Preparation of the DMP as per standard guidelines (e.g., NDMA Guidelines for Disaster Management of M.I. tank, BIS codes, etc.) including Pre-Disaster Phase: Early warning systems, Communication protocols, Preparedness and training activities, Community awareness plans. During Disaster Phase Emergency response actions, Evacuation plans and route mapping Roles and responsibilities of stakeholders, Activation of Emergency, Operation Centers (EOCs), Post-Disaster Phase: Damage assessment, Relief and rehabilitation measures, Restoration of services, Post-incident review, Define roles and responsibilities of M.I. tank authorities o State/District Disaster Management Authorities, Local administration o Emergency services (Police, Fire, Health, etc.), Development of a command structure and coordination mechanism, Capacity Building and Training Design and deliver training modules for M.I. tank staff and local emergency responders, Conduct mock drills and simulation exercises, Prepare Standard Operating Procedures (SOPs), Community Awareness and Public Participation, Community risk communication strategies, Public information dissemination plans, Coordination with local NGOs and civil society organizations, Documentation and Reporting, Draft and final Disaster Management Plan document, Maps, charts, SOPs, contact directories, etc., Submission of soft and hard copies in required formats and as directed by Engineer in Charge complete | 1.00 | job |
| 2 | Scope of work for preparation of waste management plan 1. Introduction This Scope of Work outlines the solid waste management responsibilities for the construction, maintenance, and/or operational phases of the earthen M.I.tank project located at Charawane, Sattari Goa. The aim is to ensure environmentally sound and regulatory-compliant waste handling practices. 2. Objectives Prevent environmental pollution during M.I. tank construction, operation, or maintenance, Ensure safe handling, segregation, collection, transportation, treatment, and disposal of solid waste, Comply with applicable environmental laws and regulations (eg. Solid Waste Management Rules, 2016-India or relevant local legislation) 3. Scope of Services, 3.1 Waste Characterization Identification and classification of solid wastes generated (e.g., construction debris, organic waste, plastics, hazardous waste, etc.), Quantification of expected waste volumes during different project phases, 3.2 Waste Segregation Setup and management of on-site segregation systems (biodegradable, non-biodegradable, recyclable, hazardous), Color-coded bins and signage for effective segregation, 3.3 Waste Collection and Storage, Daily/periodic collection of solid waste from designated zones (labor camps, construction sites, offices, etc.), Temporary on-site storage with proper containment to prevent leakage, odor, and pest infestation, 3.4 Waste Transportation, Transport of segregated waste to appropriate treatment or disposal facilities, Use of authorized waste transporters where required, 3.5 Waste Treatment and Disposal Biodegradable waste: composting or approved bio-treatment, Recyclables: sent to authorized recycling centers, Construction and demolition (C&D) waste: reused on-site (if possible) or sent to approved C&D facilities, Hazardous waste: handled and disposed of as per applicable hazardous waste rules, 3.6 Camp and Office Waste Management Provision of sanitation and waste management systems in labor camps and project offices, Awareness programs for workers on solid waste management, 3.7 Compliance and Documentation Maintain records of waste generated, transported, and disposed of. Submission of periodic waste management reports to project authorities or regulators.Ensure compliance with environmental clearance conditions and local/state solid waste regulations, 4. Responsibilities Contractor Develop and implement a Solid Waste Management Plan (SWMP), Deploy trained personnel and appropriate equipment, Ensure proper hygiene and sanitation on-site, Client/Project Authority, Review and approve the SWMP, Monitor implementation through periodic inspections, 5. Deliverables Solid Waste Management Plan (SWMP), Monthly Waste Generation & Disposal Report format, Incident reports (if any waste spills, non-compliance,etc. format and as directed by Engineer in Charge complete | 1.00 | job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054