- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Orissa Mining Corporation Limited
- >
NTID 43823459
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of in Koraput - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in Koraput, India.
- Opening Date : Tue 17th February, 2026
- Closing Date : Mon 16th February, 2026
- ₹ 5309000.00
- NTID 43823459
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
53100.00 -
Document Cost
11800.00 -
Estimated Cost
5309000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | CORRIGENDUM-2 | Date |
| 2 | CORRIGENDUM-1 | Technical Bid |
BOQ Items Total Items : 12 | Total Qty : 2055.75
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Civil works | ||
| 2 | Earth work in excavation of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, stoney earth and earth mixed with boulders ( except sheet rocks and boulders requiring for blasting) including dressing and levelling the bed up to the required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P shoring and shuttering and dewatering if required etc. comp. as directed by EIC. | 309.80 | Cum |
| 3 | Filling foundation and plinth with river sand, well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and T&P required for the work etc. complete as per direction of EIC. | 52.40 | Cum |
| 4 | Providing & laying of plain cement concrete of prop.(1:3:6) in foundation using 40 mm. size crusher broken hard granite metal of approved quality from approved quarry including lowering, laying concrete to required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalties of all materials, watering and curing and cost of all labour, T&P required for the work etc. compleete as per direction of EIC | 52.78 | Cum |
| 5 | R.C.C. work of M-20 having minimum compressive strength of 200 kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills and centering and shuttering. | 190.09 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054