- Home
- >
- Tender
- >
- Assam Tender
- >
- Department of North Eastern Coalfields Coal India Limited
- >
NTID 43686837
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Benching Of Ob D in Tinsukia - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Benching Of Ob D" in Tinsukia, India.
- Opening Date : Mon 16th February, 2026
- Closing Date : Sat 14th February, 2026
- ₹ 11062968.00
- NTID 43686837
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
138300.00 -
Document Cost
Refer Documents -
Estimated Cost
11062968.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum |
| 2 | WORK EXPERIENCE CRITERIA | Technical Bid |
BOQ Items Total Items : 5 | Total Qty : 81138.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in Soil with Dozer with lead upto 100 Mt (Excavation for road way in soil by mechanical means including cutting and pusshing the Earth to site of embankment upto a distance 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross section | 64437.500 | Cum |
| 2 | HIGHWAYS, Page-8, 1.1(C) Loading and unloading by mechanical means (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haultage and return trip) | 2000.000 | Cum |
| 3 | HIGHWAYS, Page- 8, 1.4(iii) Cost of Haulage Excluding Loading and Unloading (iii) Katcha Track and Track in river bed/nallah bed and choe bed.Considering 6 km carriage | 12000.000 | Cum/Kg |
| 4 | Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc including refilling the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lift as directed and specified in the following classification of soils includig bailing out water where necessary as directed and specified (In hard/Dense soil) | 2700.000 | Cum |
| 5 | Total impact of GST for the purpose of CTC | 1.000 | Nos |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054