- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Bareilly Development Authority
- >
NTID 47215988
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum 1 Greater Barei in Sharma - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum 1 Greater Barei" in Sharma, India.
Bareilly Development Authority
Sharma, Uttar Pradesh, India
NTID 47215988
- Opening Date : Sat 14th November, 2026
- Closing Date : Fri 13th November, 2026
- ₹ 230581988.00
- NTID 47215988
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
4612000.00 -
Document Cost
30000.00 -
Estimated Cost
230581988.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Corrigendum for Date Extension | Date |
BOQ Items Total Items : 57 | Total Qty : 401468.41
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 m from the foundation trenches. including royality. P.W.D. SOR 2026Item No. 251 | 22910.11 | Cum |
| 2 | Add to items (251 to 254 for every additional 30m. lead or part of 3.0m. Or for every additional 1.5m. Lift or part of 1.5m. | 1964.09 | Cum |
| 3 | Add to items (251 to 253 for every additional 30m. lead or part of 4.5m. Or for every additional 1.5m. Lift or part of 1.5m. | 795.46 | Cum |
| 4 | Earth work in filling in ordinary soil including leveling dressing and ramming and also including cartage 4.00 Km distance Including loading unloading cost of earth royalty etc. all complete as per direction of E/I Excluding royality Analysis | 130519.21 | Cum |
| 5 | Extra for machnical compection of Earth including of levelling, dressing, watering & compacting the soil to achieve 95% proctor density etc. all complete. P.W.D. SOR 2026 Item No. 253a | 130519.21 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054