- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Public Works Department
- >
NTID 44691030
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Work Of 3x6 M Spa in Hardoi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Work Of 3x6 M Spa" in Hardoi, India.
Public Works Department
Hardoi, Uttar Pradesh, India
NTID 44691030
- Opening Date : Mon 6th April, 2026
- Closing Date : Mon 6th April, 2026
- ₹ 0.00
- NTID 44691030
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1032000.00 -
Document Cost
2714.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 21 | Total Qty : 6082.06
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantaling of existing structure like culverts bridges retaining walls and other structure comprising of masonary cement concrete wood work steel work including T & P and scaffolding wherever necessary sorting the dismantled material disposal of unserviceable and stacking the serviceable material with all lead of 1000 metres (Including Bitumen & Labour Cess but Excluding G.S.T.) For Bridge Dismantaling work | 295.00 | Cum |
| 2 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including Labour Cess but Excluding G.S.T.) For Bridge work | 612.00 | Sqm |
| 3 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including Labour Cess but Excluding G.S.T.) For Bridge work | 71.50 | Cum |
| 4 | sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 (Including Labour Cess but Excluding G.S.T.) For Bridge work | 120.50 | Cum |
| 5 | Furnishing and placing reinforced cement concrement in super structure as per drawing and Technical Specifications Clause 800,1205.4 and 1205.5 RCC Grade M 30 (Including Labour Cess but Excluding G.S.T.) For Bridge work | 703.90 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054