- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Irrigation Department
- >
NTID 47272857
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Tunnel From Km in Sonbhadra - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Tunnel From Km" in Sonbhadra, India.
Irrigation Department
Sonbhadra, Uttar Pradesh, India
NTID 47272857
- Opening Date : Wed 18th November, 2026
- Closing Date : Wed 18th November, 2026
- ₹ 0.00
- NTID 47272857
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2173000.00 -
Document Cost
2360.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 23 | Total Qty : 61347.43
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of mix soil for making of Canal section including cost of labour charges, dressing of canal section including all lead and all lift,T&P, Labour, etc. required for proper completion of work as per directon of engineer- in- charge. | 10847.73 | Cum |
| 2 | Earth work in excavation for making canal section in soft rock disintegrated rock or hard shale by pick axes but not required blasting for the construction of canal inclding all lift,T&P, Labour, etc. required for proper completion of work as per directon of engineer- in- charge. | 8678.18 | Cum. |
| 3 | Earth work in excavation for making canal section of other rocks by blasting removing muck and stacking including all lift,T&P, Labour, etc. required for proper completion of work as per directon of engineer- in- charge. | 2169.55 | Cum |
| 4 | Earth work in Canal section in filling by usefull quantityreach including all lift and lead upto 30M. and including filling, watering, Mechanical Campaction to bring it at OMC to Achieve minimum 95% Dry density of excavated earth into the canal section cost of labour charges,dressing etc with including lift for proper completion of work as per direction of Engineer - in-charge. | 1236.88 | Cum |
| 5 | Rock excavation in tunnel, Removal and Stacking and Proper disposal of Muck as per direction given by Engineer in charge required for proper completion of work including cost of all Lead, Lift, T&P, Labour, Taxes and Royalty etc. | 4463.98 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054