Inquiry NowConstruction Of Training Cente in Nashik - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Training Cente" in Nashik, India.
Maharashtra Engineering Research Institute Nashik
Nashik, Maharashtra, India
NTID 47159198
- Opening Date : Thu 12th November, 2026
- Closing Date : Mon 9th November, 2026
- ₹ 293827017.00
- NTID 47159198
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1470000.00 -
Document Cost
5900.00 -
Estimated Cost
293827017.00
BOQ Items Total Items : 536 | Total Qty : 346781.197
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Part A - Civil Work - Construction of Training Center & Trainee Hostel Building in MERI Campus | ||
| 2 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . | 12336.83 | One Square Meter |
| 3 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to required distance beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 meter.) By Mechanical Means | 1048.35 | One Cubic Meter |
| 4 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 916.32 | One Cubic Meter |
| 5 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5m.) By Mechanical Means | 1527.04 | One Cubic Meter |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054