- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of Public Works Special Projects Mumbai
- >
NTID 43184025
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Teaching Veter in Mumbai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Teaching Veter" in Mumbai, India.
Public Works Special Projects Mumbai
Mumbai, Maharashtra, India
NTID 43184025
- Opening Date : Mon 29th December, 2025
- Closing Date : Sat 27th December, 2025
- ₹ 404576957.00
- NTID 43184025
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2023000.00 -
Document Cost
5900.00 -
Estimated Cost
404576957.00
BOQ Items Total Items : 653 | Total Qty : 319180.2
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Civil BOQ | ||
| 2 | Clearing grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area. | 8507.550 | One Square Meter |
| 3 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 1830.370 | One Cubic Meter |
| 4 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 1357.950 | One Cubic Meter |
| 5 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5m.) By Mechanical Means | 2076.730 | One Cubic Meter |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054