Inquiry NowConstruction Of Sonpryag Water in Rudraprayag - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Sonpryag Water" in Rudraprayag, India.
MINISTRY OF WATER RESOURCES
Rudraprayag, Uttarakhand, India
NTID 45160302
- Opening Date : Tue 26th May, 2026
- Closing Date : Sat 23rd May, 2026
- ₹ 0.00
- NTID 45160302
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
199432.00 -
Document Cost
4720.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 92 | Total Qty : 28608.73
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORK- Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil | 1097.10 | CUM |
| 2 | 2.7 Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1 . 5 m in width as well as 1 0 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1 . 5 m, as directed by Engineer-in-charge. 2.7.3 Hard rock (blasting prohibited) | 49.14 | CUM |
| 3 | Carrrage of excavated earth by truck load for an average distance of 5 km | 1103.46 | CUM |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 42.78 | CUM |
| 5 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: 2.35.3.1 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 97.17 | SQM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054