Inquiry NowConstruction Of Seafarers Club in Tuticorin - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Seafarers Club" in Tuticorin, India.
V O CHIDAMBARANAR PORT TRUST
Tuticorin, Tamil Nadu, India
NTID 43167539
- Opening Date : Mon 5th January, 2026
- Closing Date : Sat 3rd January, 2026
- ₹ 0.00
- NTID 43167539
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1176810.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 176 | Total Qty : 16777
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | SCHEDULE A - CIVIL WORKS -Clearing scrub and Surface dressing of the Floor. The rate including hire charges of all machineries, removing of all rubbish from site, lead upto 50m, transportat charges and labour charges etc., complete complying with standard specification | 633.000 | SQM |
| 2 | Dismantling removing the existing Reinforced Cement Concrete work etc., by using required mechinaries including stacking of steel bars and disposal of unserviceable material within 50m lead, labour charges, as per direction of Engineer in charge. | 7.000 | CUM |
| 3 | Dismantling brick work, Tile work, and Weathering Coarse manually or by using required mechinaries and disposal of unservice material within 50 meters lead as per direction of Engineer in charge. | 168.000 | CUM |
| 4 | Providing Pre construction Anti termite treatment for the building including all chemicals as per standard specifications. Labour charges for preparing the areas for treatment spraying chemicals and other incidential charges etc., complete. The rate shall be inclusive of giving anti-termite treatment to the building for the following four stages including breaking the termite mounds making holes with crow bars at an intervel of 12"to a depth of 8" in the periphery of building and pouring chemicals etc., complete as per ISI 6313-1981 and. The antitermite chemicals used should have 0.5% concentration with 3L solution for the entire operation etc. as directed by the Engineer incharge and including cost of chemicals labour transportion etc., Stage:1 Spraying Anti-termite treatement chemicals solution for the foundation before laying the foundation concrete bottom and sides of the foundation. Stage:2 Spraying anti-termite chemicals solution to the grade beams level spraying has to be done for the grade beams brick masonry in the superstructure in contact with back fill earth. Stage:3 Spraying anti-termite chemicals solution on sand for the flooring before laying the flooring concrete. The treatment has to be carried out on the sand filling the basement after leveling operation is over. Stage:4 Spraying anti-termite chemicals solution around the building outside of the building by making crow bar holes at an intervel of 12" to a depth of 8" around the building before laying the plinth projection. This holes has to be be closed after the treatment. | 625.000 | SQM |
| 5 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.30 m height with all cross bracing for plane surfaces as detailed below, using mild steel sheets of 90 X 60 cm 10 gauge stiffened with MS angle of 25 X 25 X 3mm for boarding, laid over adjustable span & jacks and supported by 50mm dia pipes for general pipes scaffolding systems @ a spacing of 1.20m c/c and vertical connected at a height of 2.0m c/c including 'C' & 'U' clamps and base receiver cup at bottom for connecting pipes etc and removable systems etc., the rate including cost of all materials, labour charges, wastages, placing, transportation, lead & lifts, tools & plants, fuels, fixing in position at all levels, heights, masking tape in sheet joints, consumables, etc. as complete with all respects complying with relevant standard specification, as directed by the Engineer-in-charge. For column etc. | 235.000 | SQM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054