- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Gorakhpur Industrial Development Authority
- >
NTID 47255379
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Rcc Drain And in Gorakhpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Rcc Drain And " in Gorakhpur, India.
Gorakhpur Industrial Development Authority
Gorakhpur, Uttar Pradesh, India
NTID 47255379
- Opening Date : Tue 17th November, 2026
- Closing Date : Tue 17th November, 2026
- ₹ 51616513.00
- NTID 47255379
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1033000.00 -
Document Cost
2950.00 -
Estimated Cost
51616513.00
BOQ Items Total Items : 10 | Total Qty : 12220.85
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling sundried brick work including stacking of dismantled material as directed by the Engineer-incharge within a distance of 60 metres (200 ft.).as per SI No 691 | 746.02 | Cum |
| 2 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- | 3874.5 | Cum |
| 3 | Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. | 774.9 | Cum |
| 4 | Cement Concrete in m20 complete as per Drawing and Technical Specifications. R.C.C. Grade M20 compaction as per Sor Rate Item no 283 & 283 A & 284 A complete in all respects. | 2745.23 | Cum |
| 5 | Suppling Fitting and Placing HYSD Bar Reinforcement iin Sub Struccture Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504 only use for sail brand Tmt bar | 1831.75 | Qtl |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054