Inquiry NowConstruction Of Rcc Bridge On in Kokrajhar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Rcc Bridge On " in Kokrajhar, India.
- Opening Date : Mon 6th April, 2026
- Closing Date : Mon 6th April, 2026
- ₹ 54547000.00
- NTID 44671410
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1091000.00 -
Document Cost
11000.00 -
Estimated Cost
54547000.00
BOQ Items Total Items : 78 | Total Qty : 29729.729
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Providing and constructing temporary island for construction of pile foundation with depth of water upto 4.0m complete as per technical specification. | 1.000 | each |
| 2 | Providing and constructing one span service road to reach island location from one pier location to another pier location | 40.000 | Meter |
| 3 | Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizontal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. | 80.000 | Meter |
| 4 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) upto 3 m Depth | 225.509 | Cum |
| 5 | Providing and Laying Cutting edge of mild steel Weighing 40kg per metre for well foundation complete as per drawing and as per clause 1200&1900 of MORTH Specifications | 3.854 | tonne |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054