- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of PANCHAYAT SAMITI
- >
NTID 45201838
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Protection Wal in Alibagh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Protection Wal" in Alibagh, India.
PANCHAYAT SAMITI
Alibagh, Maharashtra, India
NTID 45201838
- Opening Date : Fri 29th May, 2026
- Closing Date : Thu 28th May, 2026
- ₹ 2940695.00
- NTID 45201838
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
29407.00 -
Document Cost
1180.00 -
Estimated Cost
2940695.00
BOQ Items Total Items : 10 | Total Qty : 2492838.69
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Item No. 1 - Excavation for foundation/pipe trenches in Soft murum, road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in charge, normaldewatering, preparing the bed for foundation and excluding backfilling, etc.complete | 98.10 | Cum |
| 2 | Item No. 2 - Excavation for foundation/pipe trenches by all means in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc, complete. | 98.10 | Cum |
| 3 | Item No.3 - Providing & laying in situ. C.C of trap granite/quartzite /gneiss/metal for foundation & bedding including dewatering, from work,compacting, curing, finishing etc. complete. M 150 | 40.88 | Cum. |
| 4 | Item No.4:- Providing and casting in situ C.C. of trap/granite/quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherevermecessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S.orTorreinforcement) R.C.C. M-150 for protection wall | 253.83 | Cum. |
| 5 | Item no 5 - Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes caps,footing, foundation, slab,beams,columns, canopies, staircase, newels, chajjas, lintels,pardies, coping, fine arches etc.-as per detailed designs, drawing & schedule s including cutting,bending, hooking the bars, bindingwith wires or tack welding & supporting as required etc. complete (including cost of binding wire). Tor steel | 3.99 | MT |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054