- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY
- >
NTID 44561095
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Proposed Urban in Parganas - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Proposed Urban" in Parganas, India.
KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY
Parganas, West Bengal, India
NTID 44561095
- Opening Date : Fri 10th April, 2026
- Closing Date : Tue 7th April, 2026
- ₹ 8958229.00
- NTID 44561095
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
179165.00 -
Document Cost
Refer Documents -
Estimated Cost
8958229.00
BOQ Items Total Items : 227 | Total Qty : 15775.821
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 374.80 | SqM |
| 2 | Earthwork in excavation in foundation trenches or drains, in all sorts of soil ( including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils within a lead of 75 m as directed including trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc. as required complete. a) Depth of excavation not exceeding 1500mm | 337.38 | CuM |
| 3 | b) beyond 1500mm to 3000 mm depth | 21.50 | CuM |
| 4 | Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.( Payment to be made on the basis of measurement of finished quantity of work ). a) With earth obtained from excavation of foundation. | 236.50 | CuM |
| 5 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 63.00 | CuM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054