- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of Dr. Panjabrao Deshmukh Krishi Vidyapeeth
- >
NTID 46570742
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Processing Pla in Akola - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Processing Pla" in Akola, India.
Dr. Panjabrao Deshmukh Krishi Vidyapeeth
Akola, Maharashtra, India
NTID 46570742
- Opening Date : Fri 18th September, 2026
- Closing Date : Wed 16th September, 2026
- ₹ 11265496.00
- NTID 46570742
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
112700.00 -
Document Cost
1180.00 -
Estimated Cost
11265496.00
BOQ Items Total Items : 51 | Total Qty : 7723.51
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated materials up to a distance of 50 m beyond the building area and stacking and spreading as directed, dewatering by machine/ manually or mechanically, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting as necessary complete. By Mechanical means | 398 | Cum |
| 2 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 meters beyond the building area and stacking or spreading as directed, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering by machine/ manually or mechanically etc. complete.By Mechanical means | 28.8 | Cum |
| 3 | Excavation for foundation in hard murum and Boulders including removing the excavated material upto distance of 50 meters beyond the building area and stacking or spreading as directed, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering by machine/ manually or mechanically etc. complete (Lift From 1.5 to 3.0 m) By Mechanical means | 28.8 | Cum |
| 4 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of lorophyrifos per One Square Metre of surface area covering ten years guarantee on bond paper | 525 | Sqm |
| 5 | Filling in plinth and floors with approved excavated material in 15 cm. to 20 cm. layers including watering and compaction etc. complete. | 57.6 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054