- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of Vidyasagar University
- >
NTID 43215035
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Platform For P in Midnapore - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Platform For P" in Midnapore, India.
Vidyasagar University
Midnapore, West Bengal, India
NTID 43215035
- Opening Date : Tue 13th January, 2026
- Closing Date : Sat 10th January, 2026
- ₹ 400227.00
- NTID 43215035
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 35 | Total Qty : 1020.92
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Description of Item | ||
| 2 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 200.00 | Sqm. |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete: Depth of excavation not exceeding 1,500 mm. d) Add extra for excavation in morum soil | 21.00 | Cum. |
| 4 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring.d) Add extra for excavation in morum soil | 3.00 | Cum. |
| 5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work): With earth obtained from excavation of foundation. | 5.00 | Cum. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054