- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of RURAL WORKS DEPARTMENT
- >
NTID 47278817
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Pcc Road From in Dhanbad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Pcc Road From " in Dhanbad, India.
- Opening Date : Sat 14th November, 2026
- Closing Date : Thu 12th November, 2026
- ₹ 3362699.00
- NTID 47278817
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
68000.00 -
Document Cost
5000.00 -
Estimated Cost
3362699.00
BOQ Items Total Items : 14 | Total Qty : 2897.55
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soll item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of Ell.5.1.1 BCD | 456 | M3 |
| 2 | Extra for earthwork in hard soil as per specification and direction of Ell. ( vide classification of soil item-B) 5.1.2 BCD Same as qty item no-2 | 456 | M3 |
| 3 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 for grading - Icomplete as per the dir ection of Engineer-in-charge. (4.01B (i)RCD | 300 | M3 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1%:3 (1 Cement: 1% coarse sand (zone-Il!) : 3 graded stone aggregate 20 mm nominal size) 5.3.1.1 BCD | 375 | M3 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete 5.3.17.1 BCD | 200 | M2 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054