- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of UTTAR PRADESH HOUSING AND DEVELOPMENT BOARD
- >
NTID 43952090
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Park At Sector in Lucknow - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Park At Sector" in Lucknow, India.
UTTAR PRADESH HOUSING AND DEVELOPMENT BOARD
Lucknow, Uttar Pradesh, India
NTID 43952090
- Opening Date : Sat 28th February, 2026
- Closing Date : Sat 28th February, 2026
- ₹ 1360120.00
- NTID 43952090
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
28000.00 -
Document Cost
1180.00 -
Estimated Cost
1360120.00
BOQ Items Total Items : 14 | Total Qty : 2054.9
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in surface excavation in trenches for foundation in ordinary soil loam, clay or sand including lift upto 1.5 M and lead upto 50 M and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by Engineer in incharge, within a lead of 50 M in all kinds of | 79.35 | Cum. |
| 2 | Providing and laying Cement Concrete in foundation, plinth and under floors with graded brick aggregates 40 mm nominal size in the ratio (1:4:8) comprising 1 cement : 4 coarse sand : 8 brick ballast including supply of all materials, labour, T&P etc complete of the work. | 13.23 | Cum. |
| 3 | Class 150 brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials labour T&P curing etc. required for proper completion of work. (SOR 2020 S.I. No. 6.1.2 ) | 52.90 | Cum. |
| 4 | Same as above item no. 3 but in1:6 cement and C.sand mortar for one brick thick wall in pillar ( SOR-2020 S.I. No. 6.4.2) | 15.26 | Cum. |
| 5 | Providing and laying of R.C.C. work with cement, approved coarse sand and 2 cm. (3/4") guage approved stone grit in the propration 1:1.5:3 (1 cement: 1.5 coarse sand : 3 stone grit) in plinth bend excluding supply of reinforcement necessary centering and shuttering etc. and also including supply of all labour, material,T & P curing etc. required for proper completion of the work. | 4.580 | Cum. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054