- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of WATER RESOURCES DEPARTMENT
- >
NTID 46095789
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of P c c From R e in Hazaribag - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of P c c From R e" in Hazaribag, India.
- Opening Date : Wed 5th August, 2026
- Closing Date : Mon 3rd August, 2026
- ₹ 17065362.00
- NTID 46095789
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
341308.00 -
Document Cost
10000.00 -
Estimated Cost
17065362.00
BOQ Items Total Items : 28 | Total Qty : 31230269.117608
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | E/W in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50m. Including all lifts, levellings, ramming the foundation trenches, removing roots of trees,shrubs all complete job as per approved design, building specification and direction of E/I. (5.1.1) BCD | 1279.91 | M3 |
| 2 | Earth work in excavation in foundation trenches as per designed section in ordinary soil, including moorum soil, soil mixed with kankar, pebles and boulders upto 300mm size and disposal of of the same (beyond 50 m away from the toe of dam in the country side) within initial lead of 150m and initial lift of 1.5m as per direction and specification of E/l. (PART -B WRD 6.1.8) | 1409.4 | M3 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. With Grading-IlI Material. (4.01 B (iii) RCD) | 290.76 | M3 |
| 4 | Providing clean coarse sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials,labour,royalty and taxes all complete job as per building specification and direction of E/I. (Mode of measurement compacted volume).(5.1.10 BCD) | 40.62 | M3 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (5.3.1.2) BCD | 430.08 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054