- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of GOVERNMENT OF ORISSA
- >
NTID 47241335
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Office Buildin in Bhawanipatna - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Office Buildin" in Bhawanipatna, India.
GOVERNMENT OF ORISSA
Bhawanipatna, Odisha, India
NTID 47241335
- Opening Date : Thu 12th November, 2026
- Closing Date : Wed 11th November, 2026
- ₹ 26310346.00
- NTID 47241335
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
264000.00 -
Document Cost
10000.00 -
Estimated Cost
26310346.00
BOQ Items Total Items : 338 | Total Qty : 24340.306
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth Work in exavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect. Ground Floor, Compound wall, Paver | 1033.06 | Cum |
| 2 | Supplying and filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalties and taxes of all materials, cost of all labour and T&P required for the work complete Ground Floor, Compound wall, Paver | 477.52 | cum |
| 3 | Plain Cement Concrete (1:3:6 ) using 40mm size CBBHG metal in foundationand plinth including cost, conveyance, royalties and taxes of all materials, cost of all labour and T&P required for the work complete Ground Floor, Compound wall, Paver | 158.18 | Cum |
| 4 | R.C.C.M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement. Ground Floor A)COLUMN BASE FOOTING | 58.81 | Cum |
| 5 | B)Column Super Structure,Roof beam | 37.73 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054