- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of MUNICIPAL AFFAIRS DEPARTMENT
- >
NTID 45208437
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of New Toilet Blo in Parganas - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of New Toilet Blo" in Parganas, India.
MUNICIPAL AFFAIRS DEPARTMENT
Parganas, West Bengal, India
NTID 45208437
- Opening Date : Thu 28th May, 2026
- Closing Date : Mon 25th May, 2026
- ₹ 356796.00
- NTID 45208437
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
7136.00 -
Document Cost
Refer Documents -
Estimated Cost
356796.00
BOQ Items Total Items : 30 | Total Qty : 720.10943
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Cleaning and removing conservancy garbage mixed withrubbish & other filthy materials from the road side flank,drain and compound including cutting, loading, unloadingto and from truck or cart by Mathor labour & removing thesame to any distance. | 20.10 | % Cum |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.a) In ground floor | 3.1000 | Cum |
| 3 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m. In ground floor including roof. B) Above 150mm thick. | 1.450 | Cum |
| 4 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including emoving, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 1.30 | % Cum |
| 5 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 3.50 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054