- Home
- >
- Tender
- >
- Goa Tender
- >
- Department of Goa Tourism Development Corporation Limited
- >
NTID 45171076
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of New State Of A in panaji - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of New State Of A" in panaji, India.
- Opening Date : Mon 1st June, 2026
- Closing Date : Sat 30th May, 2026
- ₹ 0.00
- NTID 45171076
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
3495853.00 -
Document Cost
30000.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 390 | Total Qty : 717455.6
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORKS | ||
| 2 | Felling trees of girth(measured at a height of 1. m. Above ground level) inluding cutting of trunks and branches removing the roots stacking the serviceable material and disposal of unserviceable material for all leads :Beyond 30 cm and upto 60 cm grith | 7.00 | Each |
| 3 | Felling trees of girth(measured at a height of 1. m. Above ground level) inluding cutting of trunks and branches removing the roots stacking the serviceable material and disposal of unserviceable material for all leads : Beyond 60 cm and upto 120 cm girth | 17.00 | Each |
| 4 | Felling trees of girth(measured at a height of 1. m. Above ground level) inluding cutting of trunks and branches removing the roots stacking the serviceable material and disposal of unserviceable material for all leads : Beyond 120 cm and upto 240 cm girth | 5.00 | Each |
| 5 | Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan )for all leads & lifts in all types of strata comprising of any type of materials either in full or part as the case may be adopting any method/methods as may be convenient as permitted (excluding blasting) in all conditions such as dry, moist, foul, saturated, submerged etc. including dressing of sides, planking and strutting, timbering, ramming of bottom, pumping and bailing out water, barricading, danger lighting, guarding and carting away excess excavated earth at the site identified by the contractor and obtaining all statuatory approvals, as directed by engineer for all lead and all lifts etc complete. | 2296.00 | Cu.m. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054