Inquiry NowConstruction Of New Jilla Seva in Tharad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of New Jilla Seva" in Tharad, India.
- Opening Date : Refer Documents
- Closing Date : Fri 31st July, 2026
- ₹ 545791841.03
- NTID 45977305
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
5458000.00 -
Document Cost
18000.00 -
Estimated Cost
545791841.03
BOQ Items Total Items : 50 | Total Qty : 74884.46
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land includding uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm removal of stumps of tress cut earlier and disposal of unserviceable materials. A) By Mechanical means in area of light jungle. | 11.640 | Hectare |
| 2 | Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff all lead & Lift including dewatering etc complete.(A) Loose or soft soil | 9553.000 | Cum |
| 3 | Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff all lead & Lift including dewatering etc complete.(A) Loose or soft soil | 7999.000 | Cum |
| 4 | Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff all lead & Lift including dewatering etc complete.(A) Loose or soft soil | 6859.000 | Cum |
| 5 | Filling available selected / approved stacked excavated earth (excluding rock) (Earth which is stacked at any location outside the campus non- objectionable place shall be found by the contractor) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each deposited layer by ramming and watering etc. complete as directed by Engineer Incharge. | 9925.420 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054