- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of GOVERNMENT OF ORISSA
- >
NTID 46106156
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of New Chc g Plu in Sonapur-O - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of New Chc g Plu" in Sonapur-O, India.
- Opening Date : Wed 12th August, 2026
- Closing Date : Tue 11th August, 2026
- ₹ 157996301.00
- NTID 46106156
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1580000.00 -
Document Cost
10000.00 -
Estimated Cost
157996301.00
BOQ Items Total Items : 547 | Total Qty : 178175.13
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORK Clearing and grubbing existing land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300mm ,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of unserviceable materials to be used or auctioned , up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness, Complete as specification and direction of the Engineer-in-charge. | 5950 | Sqm |
| 2 | Earth work in excavation of foundation trenches in all type of soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. Buidling Proper | 2522.32 | Cum |
| 3 | Gate & Security Cabin | 120.41 | Cum |
| 4 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. Buidling Proper | 1638.41 | Cum |
| 5 | Gate & Security Cabin | 80.27 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054