- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of KERALA STATE IT INFRASTRUCTURE LTD
- >
NTID 43892398
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Multi-storey I in Ernakulam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Multi-storey I" in Ernakulam, India.
- Opening Date : Fri 6th March, 2026
- Closing Date : Thu 5th March, 2026
- ₹ 1270956725.00
- NTID 43892398
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
500000.00 -
Document Cost
17700.00 -
Estimated Cost
1270956725.00
BOQ Items Total Items : 656 | Total Qty : 2055505.795
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | SITE CLEARING WORKS | ||
| 2 | 2.33.1 Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyound 30 cm girth up to and including 60 cm girth | 50.000 | Each |
| 3 | 2.33.2 Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 10.000 | Each |
| 4 | OD295095/2025-2026 Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 222.009 | Cum |
| 5 | 15.5 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge. | 198.359 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054