- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Directorate of Local Bodies UP
- >
NTID 45133831
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Main Gate At N in Balrampur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Main Gate At N" in Balrampur, India.
Directorate of Local Bodies UP
Balrampur, Uttar Pradesh, India
NTID 45133831
- Opening Date : Mon 18th May, 2026
- Closing Date : Mon 18th May, 2026
- ₹ 4079000.00
- NTID 45133831
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
81580.00 -
Document Cost
4100.00 -
Estimated Cost
4079000.00
BOQ Items Total Items : 49 | Total Qty : 4785.92
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORK- DHARMA PATH Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 30.62 | Cum |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 26.40 | Cum |
| 3 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete. | 2.19 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: | 2.19 | Cum |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 9.72 | SQM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054