- Home
- >
- Tender
- >
- Goa Tender
- >
- Department of Department Of Water Resources
- >
NTID 45188843
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of M i Tank At C in Bicholim - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of M i Tank At C" in Bicholim, India.
- Opening Date : Wed 20th May, 2026
- Closing Date : Tue 19th May, 2026
- ₹ 2207839.00
- NTID 45188843
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
44157.00 -
Document Cost
3000.00 -
Estimated Cost
2207839.00
BOQ Items Total Items : 1 | Total Qty : 1
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Detail planing surveying including, baseline studies cathment delineation using survey of India toposheets, remote sensing and GIS mapping, Soil erosion mapping classification of erosion intensity, Land use/Land cover survey agriculture, forest, wasteland, built-up, riverine zones, Hydrological assessement rainfall -runoff characteristics, drainage patterns,silt yield indices, Soco-economic assessment dependence of local communities on natural resources, Biodiversity inventory flora, fauna and sensitive habits (eco-sensitive zones, wildlife corridors), proposed catchment area treatment measures Engineering measures, Biological measures,community-based measures, Implementation strategy phasing -short-term, medium-term, long-term, monitoring and evaluation suggesting monitoring plan for the evaluation of effectiveness of CAT plan based on GIS/remote sensing, sedimentation studies, soil and water quality monitoring etc., budget and financing preparation of detailed cost estimates for engineering, biological and community measures, provision for monitoring, contingency and capacity-building expenses, deliverables draft CAT plan with catchment maps, final CAT plan,cost estimates, implementation schedule, monitoring framework etc.as per specifications and drawing and as directed by the Engineer-in-charge etc. complete. | 1.00 | job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054