- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of GOVERNMENT OF JHARKHAND
- >
NTID 39435003
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Library At Sah in Sahibganj - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Library At Sah" in Sahibganj, India.
- Opening Date : Mon 3rd March, 2025
- Closing Date : Sat 1st March, 2025
- ₹ 9861532.00
- NTID 39435003
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
200000.00 -
Document Cost
10000.00 -
Estimated Cost
9861532.00
BOQ Items Total Items : 200 | Total Qty : 25967159.128
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide 122 trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) | 119.07 | M3 |
| 2 | Providing Earth filling in Foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I. | 84.57 | M3 |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 13.81 | M3 |
| 4 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 260.8 | M2 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement : 1.5Coarce sand (zone-III): 3 Grade stone aggregate 20 mm nominal size) | 10.83 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054